PHYSICAL AGREEMENT
TITLE 604
GAS SYSTEM MAINTENANCE & TECHNICAL SUPPORT
AND GAS SYSTEM OPERATIONS
Section 604.3 Transmission Operations
Section | Date | Description |
---|---|---|
PRC 22370 | 10/22/2014 | Gas Operations-Gas Filed Services-San Jose: Case concerns the discharge of a Gas Service Representative (GSR) for stealing prescription medication. In this immediate case, the grievant’s actions in providing his wife internal proprietary customer information which she then used to confront the customer at her home provides substantial proof of the grievant’s wrongdoing. Termination upheld. |
RC 21802 & 21844 | 4/23/2014 | Gas Operations-Field Services: Case Concern the appropriate rate of overtime for a Gas Services Representative who was called into work prior to the beginning of his pre-arranged overtime assignment. Committee agrees to close grievance, consistent with RC-1064, RC-1499, PRC-2076, and PRC-2184, the 1.5x overtime rate was appropriate, as the start time was accelerated. |
LA 13-69 | 9/5/2013 | Company proposes to modify provisions of Section 206.8-Moving Allowance for the relocation of the Gas Control Centers to Bishop Ranch and to establish a Residence Requirement. |
LA 13-61 | 7/30/2013 | Company proposal regarding the use of contractors to perform atmospheric corrosion inspections on Farm Tap work |
LA R1-13-52 | 7/12/2013 | Established Apprentice Distribution Gas System Operator Training Program. |
LA 13-14 | 3/4/2013 | Proposes to offer a new commitment allowance in the amount of $20,000 to eligible employees (Journeyman Sys. Ope, Lead Sys Ope and Appr. Sys Ope) in Grid Control Center (GCC) in an effort to reduce the turnover rate, improve safety and stabilize the workforce. This LA cancels and supersedes LA-11-35-PGE. |
LA 12-39-PGE | 9/26/2012 | To establish job definitions and LOP for Distribution Gas System Operator, Relief Distribution Gas System Operator, and Apprentice Distribution Gas System Operator. |
LA 10-08 | 2/17/2010 | Staffing of the consolidated Gas Control Center in SF and the displacement of ees. at the current Brentwood Gas Control Center. Impacted employees are those Gas System Operators (GSO), PIO Gas System Operator M&C, and Gas System Operators in Training (GSO-IT) at the Brentwood Gas Control Center. |
LA 07-50 | 10/22/2007 | Revised program to replace the existing (LA 06-55) Apprentice Instrument Repairman Training Program. |
LA 07-36 | 9/10/2007 | To replace the May 1999 Gas System Maintenance/Gas System Operations LOP (Exhibit VI-C) with the Gas System Maintenance & Technical Support and Gas System Operations LOP. |
LA 07-38 | 8/22/2007 | Revised program to replace Gas System Operator in Training Program. |
LA 07-34 | 7/19/2007 | Proposed Operator In-Training wage progression for 1588-Gas System Operator-In-Training and 1587-Gas System Operator. |
LA 01-20 | 4/12/2001 | The 94-53 Comm. recommends to cancel LA 98-93 (system-wide POT Procedure for Gas Systems Mntce & Gas Sys. Ope.) effective 4/30/01, thereby mutually agreeing to waive the 60-day cancellation clause. Effective 5/1/01, the number of pre-arranged hours for each employee will return to zero with future OT assignments made in accordance with Title 208 of the Physical Agmt. |
LA R1-98-16 | 8/7/1998 | To replace the current System Operator Training Program Guidelines. See also 109.2, 608, and 612.5. |
LA 97-13 | 2/12/1997 | As a result of (LA 96-44) combining Region Gas Control Operator and Gas Supply Coordinator classifications, the Company established Gas System Operator - M&C (PIO), classification code 1593. See also 204.4 and 601.5. |
LA 97-06 | 1/8/1997 | Training program for the Gas System Operator classification and Gas Operator-in-Training classification. See also 109.2 and 601.5. Superseded by LA 03-02. |
LA 95-144 | 11/9/1995 | To establish a joint committee to review the Gas Supply Coordinator class. (Gas T&S LOP) and Region Gas Control Operator classification (Gas M&C) LOP) and the feasibility of establishing a combined Gas System Operator classification and association training program. See also 8.4. |
LA 93-22 | 3/2/1993 | Waived the 25 wpm typing requirement for the Gas Supply Coordinator due to a disability to a Lineman's left hand appointed as Gas Supply Coordinator. See also 205.5 and 205.19. |
LA 91-163 | 10/16/1991 | Modification of climbing requirement for Apprentice Gas Control Mechanics, based on issues raised in 1990 negotiations (wood pole climbing no longer significant part of job). New three-day school outlined. |
LA R3-90-241 | 5/28/1991 | Establishes classifications of 1704 Senior Operator Mechanic and Relief Senior Operator Mechanic with job definitions, wage rates and LOP. See also 204.4. |
LA 90-8 | 1/16/1990 | Proposes to change test requirements and/or administrative procedures for Gas Supply Coordinator and Maintenance Assistant. |
LA R2-87-91 | 5/19/1987 | Establishes classification of Gas Supply Coordinator with job definition, entrance tests, and training program, replacing Terminal Operator and Senior Terminal Operator. |
LA 86-82 | 7/7/1986 | Reclassification of all Terminal Operators and Sr. Terminal Operators to Gas Supply Coordinator (1836) with revised job definitions. |
LA 80-94 | 12/17/1980 | Amends lines of progression of 1835 Terminal Operator by adding note, "A transfer application from Terminal Operator or higher classification in line of progression will be given priority 1 status" which receives preference over all other transfers and is treated as bid under 205.7(a), (b), or (c). See 602.1, 603.1, 609.2 and 612.5. |
LA 80-62 | 8/21/1980 | Amends job definition and lines of progression to allow STANPAC employees transfer and prebid rights into PG&E PLO Department. PLO employees also have bidding rights into STANPAC. See 604.2 and 604.4. |
LA 78-31 | 7/6/1978 | Change of hours of first and third shift, adoption of 21-day rotation schedule and elimination of third shift for Terminal Operators at PLO operating facility in Milpitas. See 202.8. |
LA 2117 | 8/6/1975 | Apprentice Gas Control Mechanic and Transmission Mechanic training and qualifying for Apprenticeship. Revises job description of Helper and eliminates Yardman classification, excepting incumbents. |
LA 1063 | 3/8/1974 | Training program for Terminal Operators established. |
LA 272 | 5/1/1968 | Reorganization of Measurement and Control Group of the Pipe Line Operations Department, effective 5-8-68. |
LA 13-47-R1 | 8/15/2013 | Company proposal to establish 5 new class-ifications in the TPCO Dept: Lead Gas Control Tech, Gas Control Tech, Lead Mechanic-Welder, Transmission Mechanic, and Utility Worker-GSM |
LA 13-48 | 6/26/2013 | Company proposal to update LA 12-45-PGE with hourly wage increase for Lead Gas Transmission Technicians (2416) |