PHYSICAL AGREEMENT
TITLE 304
WAGES AND CLASSIFICATION
Section 304.4 New Classifications and Wage Rates
Section | Date | Description |
---|---|---|
LA 19-17 | 05/28/2019 | EO Retention & Attraction for Specific Locations 22% hrly Premium |
LA 19-05 | 2/27/2019 | Create a new Safety and Infrastructure protection (SIP) line of progression |
LA18-05 | 4/25/2018 | Lead Inspector/Lead Pipeline Inspector classifications in General Construction (GC) Gas Line of Progression-Qualification |
LA 18-04 | 4/25/2018 | Lead Inspector/Lead Pipeline Inspector classifications in General Construction (GC) Gas Line of Progression. |
LA 17-42 | 12/18/2017 | Create Welder American Welding Society (AWS) Certified position at Davis Fabrication Shop. |
LA 16-33 | 8/25/2016 | Amend the Towerman Job Description and incorporate the helicopter premium into the base rate of pay. |
LA 16-25 | 7/14/2016 | Establish a Lead Tapping Technician in the Gas General Construction Line of Progression. |
LA 16-23 | 7/14/2016 | Allow certain classifications under limited circumstances to utilize the helicopter work procedure. Cancels and supersedes L/As R2-09-08 and R1-03-31. |
LA 15-47 | 11/9/2015 | Electric Classification and LOP |
LA 15-44 | 10/29/2015 | Extend CDLA hourly wage rate to the Painter A & B classification under the same condition in LA 12-32 |
LA 15-33 | 7/31/2015 | Establish Welder Leader – GC Gas |
LA 15-23 | 7/7/2015 | Apprentice Cable Splicer Update |
LA 15-13 | 5/1/2015 | Electrical Technician Classification & LOP |
LA 15-07 | 5/2/2015 | Update of Electric Towerman LOP section 600.13 EX V1-M |
LA 14-39 | 9/19/2014 | GC Job Definitions $ LOP |
LA 92-79 LA 92-135 | 6-9-92) & LA 92-135 (10-20-92 | Diablo Canyon Power Plant (DCPP) outage worker wage rates. See also 204.4. |
LA 13-70 | 9/5/2013 | To establish Apprentice Water System Repairperson - GC (AWSR) SAP Job Code 51560454 and Water System Repairperson - GC (WSR) SAP Job Code 51560455. Company proposes 2013 wage increases for the T200 WSR, WSR - Helms and T200 Water System Crew Leader effective the 1st of the month following ratification of this agreement. This provides a 4% increase for incumbent Water System Crew Leaders and Water Systems Repairpersons who have at least 24 months in the position. The General Construction Master Apprenticeship Agreement will be updated to reflect the new T300 Apprentice Water System Repairperson classification under Hydro Construction. JDLOP Electric Maintenance Division and General Construction Station, Substation and Hydro, will be updated to include the new T300 AWSR and T300 WSR classifications. |
LA-13-58 | 8/5/2013 | Company proposal regarding CDL pay for grandfathered Towerman-GC (50010430) |
LA-13-54 | 6/27/2013 | Company proposal regarding addition of additional classifications that are eligible for CDL pursuant to L/A 12-32 |
LA-13-23 | 4/5/2013 | Revised job definitions for (2400) Electrical Technician and (2402) Electrical Technician-Helms. Job definition for (2387) Electrical Technician-GC will be added to GC department. |
LA-12-32-PGE | 1/11/2013 | This LA reflects the agreement reached in general negotiations regarding the CDLA (Commercial Drivers License Addendum). The Co. will convert the existing $600 CDLA premium to an hourly rate for those employees covered by a CDLA letter agreement. This LA cancels and supersedes LA R1-12-08-PGE. |
LA-12-66-PGE | 12/20/2012 | Adjusted 2012 rates of pay for T200 and T300 Electrical Technicians including Electrical Maintenance Crew Leaders. This LA cancels and supersedes LA 11-46-PGE. |
LA 12-60 | 11/2/2012 | In conjunction with the Companys Pipeline Safety Enhancement Program, the Company proposes a Welder Retention Program for the following classifications: T300 Welder; T300 Working Foreman B-Gas and T300 Working Foreman A-Gas. |
LA 12-53 | 10/29/2012 | To apply the 5% differential to the newly established T-300 Pre-Apprentice Lineman classifications. |
LA 12-35 | 8/9/2012 | Current T300 Welders who volunteer and become qualified for in-service welding procedures will receive a 3.0% wage increase over the base wage rate. This LA cancels and supersedes LA 11-48-PGE. |
LA-12-04 | 1/20/2012 | Cancels and supersedes LA 11-45-PGE to correct the SAP codes noted in that letter. To continue to utilize journeymen and above in the GC and Electric T&D LOP on a temporary basis, but in a designated classification: T200 Lineman Subject Matter Expert (SAP Code 50430686); T200 Electric Crew Foreman Subject Matter Expert (SAP Code 5030687); T300 Lineman Subject Matter Expert (SAP Code 50430688); and T300 Subforeman A Subject Matter Expert (SAP Code 50430689). The objective of this assignment will be to support further development of the Electric Construction training programs. |
LA 11-45 | 11/18/2011 | To continue to utilize journeyman and above in the GC LOP and Electric T&D LOP on a temporary basis, but in a designated classification: T200 Lineman subject Matter Expert; T200 Electric Crew Foreman Subject Matter Expert; T300 Lineman Subject Matter Expert and T300 Subforeman A Subject Matter Expert. Cancelled and superseded by LA 12-04-PGE. |
LA 11-37 | 8/29/2011 | To revise Guidelines for the Substation Construction Electrician Apprenticeship. |
LA 11-27 | 6/16/2011 | To supplement the T-200 workforce in some headquarters. T-300 Gas employees may perform gas leak survey (Surveyor) work after they receive proper training and become Operator qualified. They will move back to their Promo-Demo Area once the Project is complete and the normal cycle of surveying is in place. A T-300 employee may be assigned Leak Repair work if Operator qualified or if assigned with a T-200 Operator qualified employee. |
LA 11-19 | 5/13/2011 | To utilize the T300 HH Installer classification to perform routine SmartMeterTM module and Temperature Compensating Index (TCI) installations on oil filled rotary gas meters. |
LA 10-50 | 12/29/2010 | Establishment of classifications: SAP Code 50368698 (PS 1114) Pre-Apprentice Lineman and SAP Code 50368700 (PS 1115) Pre-Apprentice Lineman-GC. |
LA 10-10 | 2/25/2010 | Revised job duties which include installation of meters for GC Installer. |
LA R2-09-08 | 9/9/2009 | To expand the provisions of LA R1-03-31 to allow other classifications to utilize the helicopter work procedure as long as they are properly trained for transmission or distribution work. Also establish a 10% helicopter premium. |
LA 09-09 | 2/19/2009 | Transfer the T-200 HH Installer/Meter Reader classification to T-300. |
LA R2-09-02 | 2/18/2009 | Use of T-300 employees on Gas Leak Survey Project. |
LA 08-37 | 11/26/2008 | Agreed that ISTS assignments to T300 GC ees. and T200 Maintenance ees. should remain separate and distinct, however, on exception basis stated on this LA. |
LA 07-33 | 8/9/2007 | To add Fieldperson-Tower and Utility Worker-Tower into the LOP and to update the LOP to reflect the current structure of Tower Section and also to eliminate Welder, Labor Foreman A, Carpenter B and Steel Fabrication and Lead Steel Fabrication, but will only be used on a temporary basis. |
LA 07-16 | 3/7/2007 | To modify the LOP for the (2435) Gas Control Technician and the (2437) Apprentice Gas Control Technician in Gas System Maintenance. The ees. in the T-300 classifications moved into the LOP will be considered Subsection 205.7.c bidders. |
LA 07-04 | 2/1/2007 | To clarify and update the (1002) Work and Resource Coordinator LOP and bidding rights in accordance with Section 205.19 of the Agreement. |
LA R1-06-32 | 1/8/2007 | Duties and wage schedules for Utility Worker classifications: T200 (0932) Utility Worker Telecommunications and T300 (50107750) Utility Worker-GC Communications. |
LA 06-48 | 9/11/2006 | Establish 1002-Work and Resource Coordinator within the physical bargaining unit in a new department Work and Resource Department. |
LA R1-06-20 | 4/20/2006 | To implement new tools, processes and operational approaches, Co. implemented Business Transformation. Some of the changes modify the dispatch functions consolidating dispatch operations and to improve the dispatch process through the integration of technology, new work practices and expanded employee responsibilities. Establish new classifications (1760) Work & Resource Dispatcher, (1761) Relief Work & Resource Dispatcher, and (1762) Work & Resource Dispatcher-in-Training. |
LA R2-05-45 | 4/4/2006 | Requirements for two-person rubber gloving work procedures. Revisions of OM&C job definitions and lines of progression and recommend changes to the Code of Safe Practices plus Rubber Glove 3% wage adjustment rates. |
LA 06-16 | 3/31/2006 | Update the JDLOP for Section 600.2, Exhibit VI-A, Materials Distribution Department. |
LA R1-06-09 | 3/28/2006 | Propose modification to job bidding, promotion, and transfers for the GC Gas Technician LOP. All employees in the Gas Technician classification LOP, Gas Mechanic, Appr. Gas Tech., Gas Tech., Tech. Crew Leader A and B, who volunteered for critical status or who were placed by bidding or hire will receive pay adjustments. The Co. will commit to filling an increased number of vacancies within CGT GSM&TS. |
LA R2-05-67 | 3/6/2006 | Establish Exhibit XVIII - Conditions Applicable to New Generation Power Facilities applicable to Power Plant Technician. |
LA 06-02 | 1/3/2006 | Proposes that Journeyman classifications receive a 1% wage adjustment effective 01/01/06. |
LA 05-55 | 10/28/2005 | Simplify Wage Rate Rules: Each classification with a unique wage schedule will be given a separate classification code. |
LA 05-55 | 10/28/2005 | Wages Expressed as Hourly: Wages will be converted to a hourly rate. The hourly rate will be rounded to the next higher penny when the initial conversion from weekly to hourly takes place and the hourly rate will round to the next higher penny for each General Wage Increase thereafter. This provision will be effective with the January 1, 2006 GWI if ratified prior to that date. |
LA 05-27 | 6/10/2005 | Installation of AMI (Automated Metering Infrastructure). |
LA 05-23 | 5/6/2005 | To improve the productivity and safety of Rubber Gloving. Re-write LA 90-34 with some modifications. Also negotiates Rubber Glove Premium and wage adjustments. |
LA 05-16 | 4/14/2005 | Establishes new classifications under ET&D, namely (0746) Electric Crew Foreman (Transmission); 2535 Transmission Troubleman; 1094 Lineman (Transmission); 1188 Apprentice Lineman (Transmission); and, 1662 T&D Equipment Operator (Transmission). |
LA 05-05 | 2/23/2005 | To allow GC Gas Dept. Miscellaneous Equipment Operator (1646) to be equivalent to Driller (0405) for purposes of promotion to the next higher classification. This would eliminate the need for Notes 5, 6 and 7 of the GC Gas Dept. LOP chart. In addition, to modify the LOP for Driller (00405) to now be the next lower classification to Drilling Working Foreman C (0846). The purpose is to provide them with the required training and knowledge prior to being considered for a Drilling Working Foreman B (0844). This LA also shows the revised General Construction Gas Dept. LOP. |
LA R1-03-31 | 10/29/2003 | To replace LAs 96-50, 97-21 and 01-10 regarding the utilization of a helicopter when working on transmission lines. To expand the work performed by various classifications (Lineman, ECF, Trans. T-man, Subforeman, Working F-man, Appr. Lineman or Towerman) and to increase the pay rate on a temporary basis when performing electric transmission work utilizing a helicopter. |
LA 02-30 | 7/22/2002 | To amend the General Construction Master Apprenticeship Agreement incorporating changes agreed to since 1988 revision and 1999 Gen. Nego. settlement letter, 10/27/99. |
LA 02-06 | 2/28/2002 | To form a joint 94-49 committee and shall review and update the GC Welder (class code 2628) training program and submit agreed to recommended modification of the program. |
LA R1-01-26 | 8/27/2001 | Proposes that a new HH classification, 0326 HH Line Construction Inspector, be established and paid at the GC Lineman rate. |
LA 01-39 | 8/14/2001 | Revised training guidelines for Title 200 and 300 Apprentice Electricians. |
LA 01-23 | 8/2/2001 | To establish a new classification of 2285 Apprentice Cable Splicer-GC. The GC Apprentice Cable-Splicer will be considered in the LOP for General Construction Line Dept. in the t&D Section, Underground. |
LA 01-19 | 7/27/2001 | Revised JDLOP for the Title 200 Gas Transmission and Distribution Department. |
LA 01-30 | 7/27/2001 | Revised JDLOP for the Title 200 Gas Measurement and Corrosion Control. |
P RC 11389 | 6/5/2001 | No contractual violations occurred when the Co. assigned T-300 Gas Techs to perform certain work at the Steam Power Plants rather than GC Station, Substation and Hydro ees. GC Gas Tech. (class code 2405) have been installing conduit, wiring, and panels for fluid drive and internal drive fans; installing conduit and wiring for lighting; and replacing lines to gas valves at the Steam Power Plants although the majority of the work has been incident and boiler replacement work at Unit 4 at the Geysers. The Comm. reviewed the description of work and determined that the work is within the scope of the Gas Techs duties. |
LA R1-99-73 | 2/3/2000 | To revise the Note under the job definitions of the Appr. Electrical Technician, Appr. Telecommunications Technician, and Appr. Metering Systems Technician. |
LA 99-46 | 6/15/1999 | Pursuant to this section, to establish the classifications and wage rates listed on this LA for work performed during the 2R9 Refueling Outage (scheduled to begin 9/26/99) at the DCPP. Further, to extend the provisions of Las 98-35 and 98-83 to the 2R9 Refueling Outage. See also 204.4, 603.3, 603.4 and 613. |
LA R1-98-81 | 10/26/1998 | To establish classifications and wage rates listed on this LA for work performed during IR9 Refueling Outage (to begin in Feb. 1999) at the DCPP. See also 204.4 and 603.4. |
LA 97-130 | 10/14/1998 | To combine the entrance examinations for entry into the Title 200 and Title 300 Appr. Electrical Technician Training Program. In addition, a revised wage rate for Title 300 Appr. Electrical Technician is also noted. See also 109.2, 206.18, 304.5, 612.4 and 613.1. |
LA 97-115 | 9/9/1997 | To establish outages classifications and wage rates listed in this agreement for work performed during the 2R8 Refueling Outage (scheduled to begin 2-7-98) at the DCPP. See also 204.4 and 603.4. |
LA R1-97-30 | 4/4/1997 | To minimize the hardship on the Title 300 apprentices, an Appr. Equipment Mechanic in the Field for Title 300 have been established. This proposal eliminates the need to train the apprentices in Davis just to transfer them to the field upon completion of the program. See also 109.2, 206.12, and 301.14. |
LA 97-24 | 2/10/1997 | To add 0853 Working Foreman "B" to Line Construction, Paint Section LOP. It will replace the current 0854 Working Foreman "C". Incumbent Working Foreman "C" in the Paint Section will be converted to Working Foreman "B." See also 613.1. |
LA 96-114 | 11/13/1996 | To establish Outages' classifications and wage rates for work performed during the 1R8 Refueling Outage (scheduled to begin 4-19-97) at the DCPP. See also 204.4, 603.4 and 613.1. |
LA R1-96-86 | 10/22/1996 | To create a 0526 Night Fieldperson position in San Francisco Division to meet the needs of the ongoing Pipe Line Replacement program (PLRP) in and about the City of San Francisco. See also 204.4, 601.1 and 613.1. |
LA R1-96-50 | 6/19/1996 | To offer the "hotwashing" work (performed from a helicopter) to Grid Maintenance & Construction Line Dept. employees (3rd Step Appr. Linemen and above), on a voluntary basis from Meadow Lane, Moss Landing and Belmont. See also 204.4, 612.2 and 613.1. |
LA 95-154 | 12/5/1995 | Pursuant to LAs R3-91-20 and 92-56 and of this section and section 204.4, Co. proposes to establish Outages' classifications and wage rates for work performed during the 2R7 Refueling Outage (scheduled to begin March 16, 1996) at the Diablo Canyon Power Plant. |
LA R1-95-70 | 8/1/1995 | To allow 2 bargaining unit ees. to receive a 6% pay Rubber Gloving premium in accord with LA 90-34. This LA would apply only to the said employees. See also 301.20. |
LA R1-95-58 | 6/16/1995 | Pursuant to this section, establish a separate class. codes for the G.C. classifications which has identical class. codes with Title 200 classifications. See also 300.1. |
LA 95-37 | 5/16/1995 | To establish Outage classifications (i.e., Firewatch, Utility Worker - Electrical, Utility Worker - Mechanical, Utility Worker - I&C, Tool Clerk - DCPP, Materialsman, Utility Plant Clerk, Routine Plant Clerk, Dosimetry Specialist, Decon Specialist, Jr. RP Specialist, Sr. R.P. Technician, Control Technician, Electrical Technician and Instrument Repairman) and wage rates for work performed during the 1R7 Outage (per LA 94-49) at the DCPP scheduled to begin 9/30/95-11/2/95. See also 204.4, 603.3 and 603.4. |
LA R4-93-111 | 7/15/1994 | Duties of Partsman, Materialsman, Parts Leadmen, and Materials Leadmen were affected in order to maximize efficiencies and minimize disruptions to employees in connection with the Central Repair and Recovery Services restructuring at the Davis Service Center. |
LA R1-94-55 | 7/11/1994 | Establishes new classifications and wage rates for work performed during the 2R6 Outage at the DCPP. See also 204.4 and 603.4. |
LA 93-99 | 12/1/1993 | Establishes Outages classifications and wage rates for work performed during the IR6 at the DCPP. See also 204.4, 603.3 and 603.4. |
LA R1-93-72 | 10/8/1993 | Pursuant to this section, establish the classification of "Lead Repairperson" at the Davis Service Center Tool Repair Facility. See also 613.2. |
LA R5-92-96 | 8/2/1993 | Modifies the G.C. Gas Dept. LOP my moving the (1301) Gas Mech. classification to the LOP to Appr. Gas Tech. Additionally, employees in the (0580) Street Fitter classification who have the appropriate request form on file shall be considered for appointment to Gas Mechanic. See also Gas Mechanic. See also 304.1 and 613.1. |
LA R2-92-107 | 11/17/1992 | Transfer of GC line personnel into GC station department. See also 109.2, 305.5 and 613.1. |
LA 91-155 | 9/27/1991 | Establishment of 1597 Crane Operator in Drilling Line of progression, in conjunction with use of crane in excess of 10 tons by Drilling group, Manteca. Crane to be used in conjunction with large dry bore auger unit. Next lower will be 0405 Driller for purposes of 305/306; demotion/promotion units same as that of Driller. See also 613.1. |
LA R1-91-105 | 9/18/1991 | Establishment of 2027 Repairperson, 2028 Apprentice Repairperson with wage rates and lines of progression. See also 109.2, 613.2. |
P-RC 1445 | 4/30/1991 | ENCON using MEOs and Crane Operators to drive CONDOR, four-axle truck with 150 foot boom; DBU using T&D Drivers to operate vehicle. LA 91-68 (this section) creates GC classification to operate CONDOR on temporary upgrade only, with appropriate wage differential. See 613.1. |
LA 91-68 | 4/30/1991 | Establishes 1661 T&D Equipment Operator-GC to be used for temporary upgrade only, accommodating certain employees who drive the CONDOR. Also serves as settlement of P-RC 1445. See 613.1. |
LA 90-183 | 10/16/1990 | Establishes two new field classifications, 1211 Materials Handler and 1086 Lead Materials Handler, with job definitions and wage rates. See also 613.1. |
LA 90-194 | 8/29/1990 | Utilization of Tractor Operator "B" classification to handle operation of Power Screen at San Francisco only. Position will require valid Class "A" drivers license. Includes guidelines on filling the position. See also 613.1. |
LA R2-90-40 | 6/15/1990 | Modifications to 2392 Telecommunications Equipment Installer job definition, line of progression, and wage rates. Includes establishment of 36-month training program. See also 613.1. |
LA 88-149 | 12/29/1988 | Continuation of Attendance Incentive Program at Davis Service Center through 1989. See LA 88-64, this section. |
P-RC 1216 | 9/2/1988 | Company's unilateral use of Materialsman classification in Personnel and Administrative Services Department, without a negotiated line of progression in that department, violates 304.4. Grievant will be paid Field Clerk rate for time worked as Materialsman. See 613.1. |
LA 88-2 | 1/4/1988 | Cancels 0820 Cable Crew Foreman and re-establish 0649 UG Subforeman A. |
LA R4-86-47 | 2/5/1987 | Clarifies the job duties of the Metalman (1450) as utilized in the Hydro Const. Dept. |
LA R1-85-156 | 5/15/1986 | Amends the GC Master Appr. Agmt. to add the Appr. Gas Tech. classification and to adopt the training program. |
LA R2-85-112 | 1/14/1986 | Establishment of Telecommunications Equipment Installer with the proposed LOP. |
LA R3-81-90 | 5/17/1984 | Revision on job definition of Working Foreman B. |
LA 79-114 | 10/11/1979 | To establish Instrument Technician and Appr. Instrument Technician in the Station Construction Dept. of G.C. See also 613.1. |