PHYSICAL AGREEMENT
TITLE 205 JOB BIDDING, PROMOTION AND TRANSFER
Section 205.6 Forfeiture
Section | Date | Description |
---|---|---|
P RC 18726 | 2/11/2010 | An employee was awarded an Elect. Tech. Crew Lead position and then the dept. cancelled the job before the ee. reported to the position. No contractual violation occurred. |
P RC 13684 | 5/5/2003 | No violations on the bypassed of a c bidder Meter Reader to a Sr. Meter Reader, Cinnabar vacancy, for declining the job offer and for not requesting additional time to review with his doctor. |
LA 97-122 | 9/17/1997 | To waive Sec. 205.6, Forfeiture and place an employee into an Appr. Fitter position, pending completion of the Appr. Fitter school due to unique circumstances. - |
Co.'s E-Mail | 1/27/1994 | Clarifies a procedure where a prebid code represents several shifts at a headquarters. Where there are locations with more than one shift the forfeiture provision will not be enforced. See also Clerical 18.7. |
IR Memo | 2/2/1990 | Directory Listings for Systems Operators. |
LA 90-7 | 1/19/1990 | Because bidding system does not allow designation of a preferred shift, employees declining job offer to a classification at a headquarters where such classification is subject to more than one shift are not subject to six-month bar. See also Clerical 18.7. |
LA 78-47 | 8/25/1978 | Amendment applicable to this section and Clerical Sections 18.4, 18.5 and 18.7. Provide that prebids, postbids and transfer applications may be submitted by either US mail or Co. mail during and after the conversion of the bidding and transfer system to compute application. - |