PHYSICAL AGREEMENT
TITLE 202 - HOURS
Section 202.17 Change of Hours - First Four Days
Section | Date | Description |
---|---|---|
P RC 16536 & 16644 | 11/29/2006 | No violations occurred on these two grievances which concerns Co.s implementation of a Sec. 202.17 work schedule for Operators during the 2R13 Outage at the DCPP and the concerns whether ees. who are on a Sec. 202.17 work schedule for a refueling outage can be assigned to perform routine work on the operating unit. |
LA 04-04 | 1/20/2004 | Outage work schedules and conditions for the 1R12 and 2R12 outage to begin in 2004 to all Chemical and Radiation Protection personnel (including Technicians, Decon Specialists, Utility Workers and Clerks assigned to the Rad. Protection or Chemistry depts..) at Diablo Canyon. |
P RC 13293 | 4/1/2003 | Equity settlement will be paid to Willows CGT employees assigned to work hours other than their regular schedule. |
LA 01-14 | 3/23/2001 | The joint 94-53 Committee recommendations for outage schedules and working conditions for the 10th refueling outage of Unit 2 (2R10) at the DCPP. The parties agreed that this agreement is applicable to the 2R10 outage only. |
LA 97-35 | 2/24/1997 | Co. proposes to include the schedule (1st and 2nd shift) and conditions (described in this LA) as an option under this Sec. for planned and unplanned outages at the DCPP applicable to Mechanical Maint., Technical Maint., Tool Mgnt. Group, as well as Shift Control Tech. and Appr. Shift Control Tech., on a voluntary basis. See also 202.16 and 603.4. |
LA 97-37 | 2/24/1997 | To include a schedule stated in this LA as an option under sec. 202.17 for regular Chem. and Rad. Protection personnel at Diablo Canyon during planned and unplanned outages. See also 202.16 and 603.4. |
LA 96-27 | 3/14/1996 | All of the other conditions of this section will apply to the Routine Plant Clerks in the Dosimetry Dept on the 6:30 pm - 4:30 am shift with an hourly premium equivalent to the 3rd shift premium during the 2R7 refueling outages at the DCPP. See also 202.16 and 603.4. |
LA 96-23 | 3/11/1996 | Day shift PPO established at the Geyser Power Plant will be eligible for the benefits under this section. See also 202.21 and 603.1. - |
P-RC 1735 | 10/6/1994 | Rotation after 4 weeks on a 202.17 schedule is permissible not mandatory. See also 603.4. |
LA 94-75 | 8/22/1994 | Proposes the schedule and conditions described on this LA for the 6th refueling outage of Unit 2 (2R6) at the DCPP. See also 202.16 and 603.4. |
LA 94-7 | 1/25/1994 | Scheduling sixth refueling outage of Unit 1 (1R6) at the DCPP is needed to alleviate the congestion in the parking lots, access road, and shop areas during the shift change. See also 202.16 and 603.4. |
P-RC 1667 | 7/15/1993 | During 202.17 schedule, employees must return from 4/10 to 5/8 schedule. See also 603.2. |
RC 1733 | 6/19/1992 | The Company assigned Shift Control Tech. at DCPP to 202.17 schedule; P-RC agrees 202.17 can not be assigned to shift employees. See also 603.4. |
P-RC 663 | 10/8/1981 | Equipment Mechanic who was mistakenly assigned night shift will be paid OT rate for first four days. See 202.15. |
RC 386 RC 387 | 7/15/1963 | Emergency justified establishing 202.17 shifts, but work should be paid under 208 since it was done in four days. Employees to be paid OT for one-half hour to eat first meal, and travel time. |
RC 312 | 12/7/1961 | Proper to reschedule hours of Meter Repairman when necessary to utilize testing facilities. |
RC 159 | 1/14/1958 | Overtime pay required when employees working an additional shift schedule are assigned temporary work at another headquarters. See 208.11. |
RC 63 | 2/18/1955 | Section 202.17 not applicable to repairs made at Humboldt Substation over 10 weeks. First four weeks were pre-arranged OT, after which extra shift was established under 202.17. Entire job to be paid at OT rate. See 208.12. |